Zelkot - zakład elementów kotłowych

PL   EN   DE

If you want to receive our newsletter give us your email address:


New welding technologies qualified!

10.04.09

Our company has qualified welding technologies for the newest bainitic steel T24 / P24 (7CrMoVTiB10-10) and martensitic creep-resistant steel VM12-SHC (VM12 - X12CrCoWVNb12-2-2). We are ready for prefabrication of boiler elements for the newest supercritical or ultrasupercritical boilers built within Europe. Currently in cooperation with Institute of Welding, Poland we are preparing a pipe welding technology for the newest European 9%Cr martensitic steel - PB2 (X13CrMoCoVNbNB9-2-1) which is a part of COST 536 programme.

Plate heat exchanger

19.03.09

We have just finished production of a gas-air plate heat exchanger which consists of six blocks bolted together. The total weight of complete exchanger is 30 tones. It was prefabricated for a Canadian client according to ASME regulations.

Biomass boilers and waste plants

22.01.09

Together with our local and foreign partners, their knowledge and experience ZELKOT is going to produce high power biomass boilers and waste plants in the nearest future.

New technologies

29.12.08

At the present moment we are working out and implementing welding technologies for newest creep resistant steels. In the last phase of our research you can find modified 2.25Cr-1Mo steel in grade 7CrMoVTiB10-10 (T24/P24) as well as the newest steel grade developed by Vallourec&Mannesmann - X12CrCoWVNb12-2-2 (VM12-SHC). In parallel we are working out welding technologies for headers pipes made out of grades X10CrMoVNb9-1 (P91) and X10CrWMoVNb9-2 (P92).

New hall

29.12.08

Our new assembly/production hall is now fully equipped and used for fabrication of pressure elements and vessels. Currently ZELKOT hires 50 people where total roofed production area is about 3500 square meters.

Inconel cladded coils

29.12.08

At the moment we are manufacturing a huge part of Inconel 625 cladded pressure elements used in waste energy plant.

Inconel 625 cladded membrane walls

29.12.08

One of the latest job we have done was a set of Inconel 625 cladded membrane walls with headers.

Inconel 625 cladded bent tubes

29.12.08

Our company has been specializing in fabrication of Inconel 625 cladded coils and other bent elements.

Plate exchangers

29.12.08

In spring our company has started fabrication of plate gas-air heat exchangers which are used in different branches of heavy industry especially in petroleum refineries. Some part of exchangers was manufactured according to ASME IX while others were produced in accordance to EN and UDT regulations.

Boiler elements

22.01.08

Currently we are manufacturing feed water heaters, superheaters, collectors and down pipes for boiler for a German customer. Total weight of prefabricated elements is about 250 tones.